Saturday, March 21st, 2009 | Author: Marty

Laura and I spent the morning working on the trailer.  We did some cleaning, I put some sealant around the shower area to help keep shower water where it’s supposed to be, installed a TP holder (sorry… didn’t get a picture of that), installed a television bracket so we can take the TV along with us (more on that on the TV modifications page), and took some measurements so I can build some wheel chocks and a tube to hold the stinky-slinky.  Hope to have the wheel chock mod completed in the next few days.

Trailer

Trailer

I snapped this picture of the trailer all set up – thought it looked pretty good.

Tags: , Category: Ramblings
You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.
Leave a Reply » Log in


You must be logged in to post a comment.